House demolition in Lake Mary costs $7,000 to $10,000 for a small single-story home under about 1,200 square feet, and $10,000 to $14,000 for a larger or two-story house in the 1,500 to 2,500 square foot range. Those are turn-key prices: permit, utility disconnect coordination, teardown, haul-off, rough grade, and the final inspection close-out. Heavy concrete can add around $2 per square foot. The whole process, from our first walkthrough to a clean lot you can build on, runs 4 to 8 weeks. Most of that is permit time. The machine work itself is 5 to 6 hours for a small house and 2 to 3 days for a bigger one with a heavy foundation. We are Mintel Land Management, Apopka's hometown demolition contractor, and Lake Mary is a quick hop from our yard.
Free Tool
Get your own number in 30 seconds
Why Lake Mary Teardowns Are Usually Rebuilds
Lake Mary is established subdivisions on well-kept lots. Heathrow, Timacuan, Greenwood Lakes, Cardinal Oaks, and the neighborhoods around them were built out years ago. The land is worth keeping. The house on it sometimes is not. So when we get a call in Lake Mary, it is usually an owner who wants the lot but not the old floor plan, or a builder who has a new design ready and needs the existing structure gone first.
That changes how we work. A rebuild teardown has to leave the lot ready for the next crew. The slab comes out. Footings come out. The grade gets roughed in so the builder's surveyor and foundation crew can start without clearing our mess first. We bid the job that way from the start so there is no second mobilization.
The Lake Mary Demolition Permit
Every demolition in Florida needs a permit, and Lake Mary is no exception. Permits here go through the City of Lake Mary Building Department. The city's demolition permit fee is $75. That is the fee itself. Full permitting cost, once you add county licensing and processing fees, runs $900 to $2,300 across Central Florida, and that is built into our turn-key price.
Seminole County permits move faster than Orange County right now. Across the region, demolition permits are taking 3 to 6 weeks, and Seminole sits on the faster end of that range. We file the permit the day you sign. We run the disconnects and the survey at the same time so nothing waits in line behind anything else.
Here is what the city will want before it issues the permit:
- A current survey of the lot.
- Power disconnect confirmation from the utility.
- If the home is on septic, the septic abandonment pump-out completion form from the health department.
- If the home has a well, confirmation it has been shut off.
- An asbestos survey for older homes, with the state notice filed before any teardown begins.
Tearing down without a permit is not a shortcut. It is a stop-work order, extra fees, and a possible lien on the property. We have never had a customer want that trade.
The Asbestos Notice on Older Lake Mary Homes
Older homes need an asbestos survey before demolition. This is a state requirement, not a city one, and no permit office will wave it. A licensed inspector samples the building materials and writes a report. If asbestos is found, it gets handled before the machine ever touches the house. If it is not found, the report goes in the permit file and we move on.
We tell customers to budget time for this up front. It is one of the reasons we start paperwork the day you sign instead of the day the permit is ready. The survey runs while the city reviews the application. Done in parallel, it rarely adds to the overall 4 to 8 week timeline.
Utility Disconnects: The Slow One Is Septic
Power is the easy disconnect. We coordinate with the utility and get written confirmation. Water and gas follow the same pattern. If your home is on septic, that is the slowest piece. The tank has to be pumped out and abandoned, and the health department has to sign the completion form. If your home is on a well, the well gets shut off.
We handle the coordination. You do not need to chase four different offices. We tell you which one is dragging and what it is waiting on, so there are no surprises when the permit is otherwise ready.
What Teardown Day Looks Like
We can mobilize our machine and dumpsters the same day the permit clears. Our main machine weighs 30,000 pounds and it is ours, not rented. So are the dump trucks, the lowboy trailer, and the skid steer. The crew is MLM's own. No subcontracted machine work.
A small single-story house is 5 to 6 hours of machine time. A larger house with a heavy slab and footings is 2 to 3 days. A typical house fills 4 to 12 thirty-yard dumpsters. Counting haul-off, we are usually on site 6 to 7 days total. Then we rough grade the lot, call for the final county inspection, and close the permit out. You get a clean, build-ready pad and the paperwork to prove it.
In established neighborhoods like Heathrow and Timacuan, we pay attention to access. Dumpsters stage where they will not block the street. Trucks come and go on a schedule. The lot next door looks the same when we leave as when we arrived.
Lake Mary House Demolition Cost at a Glance
| Project | Price Range |
|---|---|
| Small single-story house, under about 1,200 sq ft | $7,000 to $10,000 |
| Larger or two-story house, 1,500 to 2,500 sq ft | $10,000 to $14,000 |
| Heavy concrete add-on | Around $2 per sq ft |
| Shed, barn, or garage | $1,200 to $3,500 |
| Lake Mary demolition permit fee | $75 |
| Full permitting cost with county fees | $900 to $2,300 |
Why Hire an Apopka Crew for a Lake Mary Job
Kyle Mintel lives and works in Apopka. The yard is in Apopka. Lake Mary is close enough that tight scheduling windows are no trouble, and we have put in 10+ years on Central Florida teardowns. We carry $4,000,000 in general liability and $2,000,000 in workers compensation, and we are OSHA 30 certified. Certificates go to you before the job starts, not after.
The man who quotes your job is the man on the machine. Kyle walks the lot, writes the estimate, and runs the excavator. There is no sales rep between you and the person doing the work. You get a free written estimate after the walkthrough, no obligation, and usually a same-day reply.
Questions Lake Mary Homeowners Ask About Demolition
How much does it cost to demolish a house in Lake Mary?
Turn-key, $7,000 to $10,000 for a small single-story house and $10,000 to $14,000 for a larger or two-story home. Heavy concrete can add around $2 per square foot.
How long does a Lake Mary demolition permit take?
Central Florida permits are running 3 to 6 weeks, and Seminole County is on the faster end. We file the day you sign and run disconnects at the same time.
What is the Lake Mary demolition permit fee?
The City of Lake Mary charges $75 for the demolition permit itself. Total permitting cost with county licensing and processing fees runs $900 to $2,300 and is included in our turn-key price.
Do I need an asbestos survey before tearing down my house?
Older homes do. It is a state requirement that no local permit office can waive. We run the survey while the city reviews the permit so it does not add to the timeline.
How long until I can start building?
Plan on 4 to 8 weeks from walkthrough to a clean, rough-graded lot with the permit closed out. Teardown itself is 5 to 6 hours for a small house or 2 to 3 days for a larger one.
Do you do insurance teardowns in Seminole County?
Yes. We did a two-story fire teardown in nearby Sanford that was insurance-paid. Do not demolish before the adjuster inspects unless there is an immediate safety hazard.
More on demolition in Seminole County and across Central Florida:
- Demolition in Lake Mary Our Lake Mary service page with local permit details.
- All demolition services Structure demolition, pool removal, concrete, excavation, grading.
- House demolition in Sanford The neighboring Seminole County city, including historic district rules.
- Teardown and rebuild steps in Florida The full sequence from permit to build-ready pad.
- How many dumpsters a house takes Why it is 4 to 12 and what drives the count.
- Fire damaged house demolition Insurance, permits, and cost when a fire forces the teardown.
Free Estimate
Call Us for a Free Estimate
Tell us about the job and we’ll come walk the property. Written number, no obligation, usually same-day reply. Call 407-443-2863.