Volusia County
Demolition & Excavation
in Daytona Beach, FL
Daytona Beach is oceanfront Volusia County, where salt, sand, and storm exposure are hard on concrete and structures. We work the beachside condos and the mainland alike, from oceanfront pool removals and storm-damaged structures to concrete tear-outs and grading. When a job sits right on the dune line, we bring the right machines onto the sand and protect everything around it.
Daytona Beach is an easy run east from the Apopka yard, and we bring the full fleet out on our own lowboy for beachfront work. Response in Daytona Beach is fast — typically within a day or two.
What we do in Daytona Beach
Our Daytona Beach services
Neighborhoods we serve in Daytona Beach
Not sure if we cover your spot in Volusia County? Call us at 407-443-2863 — we move where the work is.
Working in Daytona Beach
Older coastal housing and what it means
Daytona Beach has the oldest housing of any city we serve in Volusia County. The median home here was built in 1980, and about half the homes in the city are older than that. That age means we plan for an asbestos check on most teardowns, and pools that have been in the ground for decades are ready to come out. Add salt air, sand and storm exposure, and concrete and structures on the beachside wear out faster than they do inland. We work Beachside, Seabreeze, the Peninsula and Daytona Beach Shores, plus the mainland, taking out storm-damaged structures, old pools, cracked concrete, and grading lots for what gets built next.
Coastal permits, utilities and the landfill
On the beachside, the first question is the state Coastal Construction Control Line. Work seaward of it, digging or demolition, takes a Florida DEP permit in addition to the city permit. In the city, the Permits and Licensing Division at City Hall, 301 S. Ridgewood Ave, Room 127B, 386-671-8178, wants an application, a Notice of Utilities Removal and a recorded Notice of Commencement. TECO Peoples Gas and FPL have to cut service before the permit is issued, the city pulls the water and caps the sewer, and the permit runs 60 days with one 30-day extension. Unincorporated beachside areas go through Volusia County. Debris goes to the Tomoka Landfill on Tomoka Farms Road in Port Orange, $41.09 a ton, which we haul ourselves.
Local rules · Volusia County
What to know before you build or tear down in Daytona Beach
Every city runs its permits a little differently. Here is how Daytona Beach does it, pulled from the city and county’s own published rules. We pull the permits and schedule the inspections for you.
Who issues the permit
City Hall, 301 S. Ridgewood Ave, Room 127B, Daytona Beach, FL 32114
386-671-8178
What a Daytona Beach demolition permit needs
- Application, Notice of Utilities Removal and a recorded Notice of Commencement
- Gas cut by TECO Peoples Gas and power by FPL before the permit is issued. The city pulls the water service and caps the sewer
- Volusia County Health permit for septic abandonment where there is a tank
- Permit good for 60 days, with one 30-day extension
- Florida DEP asbestos notice filed at least 10 working days before the start date (state rule 62-257)
Pool removal in Daytona Beach
Tree rules
Where the debris goes
Daytona Beach homes
Only in Daytona Beach
- Beachside lots sit inside the state Coastal Construction Control Line. Any digging or demolition seaward of that line needs a Florida DEP permit on top of the city one.
- About half the homes in Daytona Beach were built before 1980, so asbestos checks and old pools come up on a lot of our jobs here.
Rules and fees checked against official sources in October 2026. Cities change them, so we confirm with City of Daytona Beach Permits and Licensing Division before every job.
Daytona Beach FAQ
Demolition questions from Daytona Beach
- Who issues demolition permits in Daytona Beach?
- City of Daytona Beach Permits and Licensing Division, City Hall, 301 S. Ridgewood Ave, Room 127B, Daytona Beach, FL 32114, 386-671-8178. We pull the permit and schedule the inspections as part of the job.
- What does a demolition permit in Daytona Beach require?
- Application, Notice of Utilities Removal and a recorded Notice of Commencement; Gas cut by TECO Peoples Gas and power by FPL before the permit is issued. The city pulls the water service and caps the sewer; Volusia County Health permit for septic abandonment where there is a tank; Permit good for 60 days, with one 30-day extension; Florida DEP asbestos notice filed at least 10 working days before the start date (state rule 62-257).
- Do I need a permit to remove a pool in Daytona Beach?
- Daytona Beach does not publish a separate pool removal checklist, so pool jobs here run under the demolition permit and we confirm the details with City of Daytona Beach Permits and Licensing Division before we break ground.
- Do I need a permit to remove trees in Daytona Beach?
- Daytona Beach requires a tree removal worksheet and a site plan showing every tree 6 inches and up, and lots have to keep a set number of trees.
- Where does demolition debris from Daytona Beach go?
- Volusia County's Tomoka Landfill at 1990 Tomoka Farms Road in Port Orange takes demolition debris at $41.09 a ton as of October 1, 2026. We haul there ourselves.
The Mintel Difference
Owner-operated.
Every job.
No renting equipment after the handshake. No cheap subcontracted labor. We own and run our own fleet of machines, so the people who quote your job are the people on the controls.
Owned

What Clients Say
Trusted Across Central Florida
5.0on Google, 8 reviews
“We hired Mintel Land Management to demo a house and the job was completed on time and everything was done correctly, inspectors were glad to have a good contractor on the job.”
“I have used this company over a dozen times with the removal of trees and stumps in my yard. The owner has become more of a friend then just a demolition company.”
“Reliable and dependable. Straightforward pricing does great work. Will definitely use again.”
“We contacted Kyle in hopes that he would be able to remove a very large pine stump from our back yard and grade the area after removal. He was above and beyond helpful and even cleared the vacant property lines on both sides of our property! He was very professional and respectful of our property, he was on time and his prices were very reasonable for the work performed. We will definitely be using his services in the future for our driveway widening project and any other future projects. 6 stars, I highly recommend using Mintel Land Management.”
“Excellent experience from start to finish. Fast, professional, and easy to work with. Would definitely recommend and use again.”
“Kyle came and pulled a few fallen trees out at my property and graded out another part. He came when he said he was going to as well.”
Free Estimate · Mon–Sat 7a–8p
Get a free bid in Daytona Beach
Tell us about the job and we’ll come walk the property. Written number, no obligation, fast — typically within a day or two reply.
- Owner-operated — we run our own machines
- We own our fleet, so no rental delays
- Owner-operated, $4M insured, every piece hauled off
Free Estimate · Mon–Sat 7a–8p
Ready to Clear the Lot?
Tell us about the job and we’ll come walk the property. Written number, no obligation, usually same-day reply.





